We ride the C1 loop after the last train clears Shibuya. Four laps. Wet elevated concrete, the tunnels to ourselves, and nobody up here until the delivery trucks come off the Kasumigaseki ramp.
Twelve of us. Four have ridden the loop since 2019, the rest turned up one at a time and stayed.
No patches and no club. Two bikes minimum, five maximum, and nobody rides ahead of whoever knows the exits.
Twelve of us
Nine bikes
One route